| Item | Packhouse | Fert Room and Storage |
|---|---|---|
| Footprint | 100 × 80 ft, 8,000 ft² | 100 × 80 ft, 8,000 ft² |
| Heights | Eave 14 ft, ridge about 17 ft 4 in (1:12 roof) | Eave 15 ft, ridge about 18 ft 4 in (1:12 roof) |
| Light panels | No | Yes, 12.5 to 14.5 ft |
| Slab | – 4,000 psi– Pack room slopes to its trench drain at 1/8 in per ft (1%) | – 8,000 lb forklift wheel loads– Courtyard between buildings, 8,000 lb, sloping north/south to a centre drain that falls east |
| Parking | – North wall: 5 stalls flush against the packhouse– 20 stalls, one row (180 × 42 ft with its aisle), east property line | |
| Septic | 100 × 15 ft between the packhouse and the Lettuce Grow | |
| Floor finish | Epoxy | |
| Drains | – Pack room: trench drain– Bin wash | Trench drain along the front of the fertigator, forklift grade |
| Ventilation | None | – Fert room: one exhaust fan high in the gable end, a low intake vent– Storage: roof vents only, no fans |
| Insulation | See open questions | See open questions |
| Water | Potable for sanitation; hot water for bin wash | Fill tanks. Ag water only |
| Fitout | – 6 × 6 ft block of lockers– Eyewash station near the bathrooms– Manual leveller and dock shelter. Thomas: can we get angled prefab shelters?– All doors auto– Japanese/English shrinkwrap and labeller– 5 Keiki tables– Box erector– Pallet wrapper– 2 desks– Bin wash awning, open, 70 × 30 ft off the south wall | – Dry storage pallet racking (two high on the floor plus one shelf)– Manual dock levellers, no shelters– All doors auto– Exhaust fan centred high in the fert room's gable end |
| Load | Building | Where | Est. kW | Basis |
|---|---|---|---|---|
| Cooler refrigeration | Packhouse | Cold storage | 12 | Mini-splits on CoolBot Pros, held at 55 °F. kW is a placeholder until the HVAC sizing |
| HVAC | Packhouse | Pack room, box store, break room | 18 | Mini-splits, held at 70 °F. kW is a placeholder until the HVAC sizing |
| Packing machine (J/E) | Packhouse | Pack room | 10 | Wrapper, packers and rotary table; vendor to confirm |
| Box erector | Packhouse | Box store | 3 | |
| Air compressor | Packhouse | Box store | 7.5 | 10 hp, for the box erector and packing machine |
| Pallet wrapper | Packhouse | Pack room, by the cooler door | 1.5 | Turntable wrapper |
| Scale/checkweigher | Packhouse | End of the packing machine | 0.5 | |
| Bin washer and water heater | Packhouse | Bin wash | 25 | 7.5 kW of pumps and drive plus an 18 kW electric heater; about 7.5 kW if the hot water is propane |
| Water heater, break room appliances | Packhouse | Break room, bathrooms | 6 | 4.5 kW water heater, fridge and microwave |
| Roll-up operators, 3 | Packhouse | R1, R2, R3 | 2.2 | 1 hp each |
| Lighting | Packhouse | All rooms | 5 | LED at 0.6 W/ft² over 8,000 ft² |
| Reefer plugs, 3 | Packhouse | Truck court, by D1/D2 | 30 | 240 V 3-phase, ours; about 10 kW each holding a 40 ft reefer at 50 °F, about 27 A running |
| Forklift charging | Packhouse | Box store | 6 | 48 V charger; eyewash if lead-acid |
| General receptacles | Packhouse | All rooms | 3 | Desks, tools |
| Fertigator and irrigation pumps | Fert | Fert room | 15 | Placeholder: two 10 hp pumps; count and hp TBD |
| Exhaust fan | Fert | F1, fert room gable end | 0.75 | 36 in, 1 hp; storage has roof vents only |
| Roll-up operator | Fert | R1 | 0.75 | 1 hp |
| Lighting | Fert | All rooms | 4 | LED at 0.5 W/ft²; less by day under the light panels |
| General receptacles | Fert | All rooms | 3 |
| Building | Est. kW | Amps at 240 V 3-phase | Panel |
|---|---|---|---|
| Packhouse | 130 | 347 | 600 A |
| Fert Room and Storage | 24.25 | 65 | 100 A |
| Both, one service | 154 | 412 | 600 A, 240 V 3-phase |
| Source | Where | Est. kW | Basis |
|---|---|---|---|
| Backup generator | Outdoors by the service | 80 | Standby, automatic transfer switch on the critical loads: cooler refrigeration (12 kW), the three reefer plugs (30 kW), fertigator and irrigation pumps (15 kW), some lighting and controls (about 8 kW). About 65 kW running, 80 kW to start the motors. Diesel or propane |
| Solar, with batteries | TBD | TBD | Get a quote, check grants; location TBD |
| Door | Building | Type | Size (W × H) | Where | Notes |
|---|---|---|---|---|---|
| D1 | Packhouse | Dock | 8 × 9 ft | East wall, into cold storage | Insulated, angled 22°, manual leveller, dock shelter; 40 ft containers out. Auto |
| D2 | Packhouse | Dock | 8 × 9 ft | East wall, into cold storage | As D1 |
| R1 | Packhouse | Roll-up | 10 × 10 ft | North wall, into the pack room | Harvest box trucks in. Auto |
| R2 | Packhouse | Roll-up | 10 × 10 ft | North wall, into cold storage | Box trucks out. Insulated. Auto |
| R3 | Packhouse | Roll-up | 8 × 10 ft | South wall, pack room, east end | Forklift only: boxes from the fert building |
| P3 | Packhouse | Personnel | 3 × 7 ft | South wall, pack room | Onto the bin wash |
| P4 | Packhouse | Personnel | 3 × 7 ft | North wall, west end, break room | Staff entry |
| I1 | Packhouse | Cooler door | 8 × 9 ft | Pack room to cold storage, by the wrapper | Insulated high-speed door. Not yet marked on the drawings |
| I2 | Packhouse | Glass door | 4 × 7 ft | Break room to pack room | |
| I3–I5 | Packhouse | Interior, 3 | 3 × 7 ft | Break room to the cleaning store and both bathrooms | |
| D1 | Fert | Dock | 8 × 9 ft | East wall, south part, into dry storage | Manual leveller, dock shelter; 45 ft containers. Auto |
| D2 | Fert | Dock | 8 × 9 ft | East wall, north part, into dry storage | Box truck. Manual leveller, dock shelter. Auto |
| R1 | Fert | Roll-up | 8 × 10 ft | North wall, fert room | Forklift only: boxes out to the packhouse's R3 |
| P1 | Fert | Personnel | 3 × 7 ft | South wall, east end, dry storage | Egress |
| P3 | Fert | Personnel | 3 × 7 ft | North wall, fert room, beside R1 | Swings out, panic bar |
| I1 | Fert | Interior opening | 8 × 10 ft | Partition, dry storage to fert room | Forklift route |
| Window | Building | Size (W × H) | Where | Notes |
|---|---|---|---|---|
| — | Packhouse | 14 × 3.5 ft | Break room to pack room, sill 3.5 ft | Interior glazing |
| — | Packhouse | 11 × 3.5 ft | Break room to pack room, sill 3.5 ft | Interior glazing |
| — | Fert | Band, 2 ft high | All four walls, 12.5 to 14.5 ft | Translucent light panels |